Capacity Development for Integrated River Basin Management in Indonesia with special reference to Central Kalimantan

Abstract River basins sustain ecosystems, which are the main source of water for living and socio-economic development. On the other hand, integrated management refers to various essential management aspects to achieve a sustainable development of river basins. It includes the management of water demand and supply, upstream-downstream linkages, water and land resources development, as well as preserving and restoring the freshwater ecosystem. In this context the Integrated River Basin Management (IRBM), as an alternative and more effective approach to the common fragmented practices, is a concept that is receiving increasing attention. Managing changes from fragmented practices to an integrated approach is a paramount undertaking that a country should anticipated in managing its river basins. These changes in management concept required a capacity development at national level, down to the river basin level. Indonesia, like many other countries, has been gradually implementing capacity...

World population by 2050 and Water Resources Issues

According to UN estimates that release in March 11th, 2009 the worlds population was projected to exceed nine billion in 2050, up from 6.8 this year and seven billion early in 2012. The additional 2.3 billion are mostly in the developing world, which was estimated to increase from 5.6 billion this year to 7.9 billion in 2050. During the same period population in the developed nations was estimated to rise from 1.23 billion to 1.28 billion. This estimate figure included the projected net immigration that are coming from developing countries at a rate of 2.4 million persons annually from 2009 to 2050. Within the developing countries population for 49 least developed countries is going to be doubled from 0.84 billion to 1.7 billion, while for the rest of third would its population is increasing from 4.8 billion to 6.2 billion during the same period. It should be noted tht the most probable scenario of future direction of fertility rates are its declines from 2.56 children per women in 20...

Flood is a social problem

Flood is a social problem and should be solved as an integrated flood management. Technical or engineering approached, through the construction of civil engineering (physical) infrastructures,  only give a partial solurion.  Mathematical modeling couple with geographic information and communication technology is a tool for integrated flood management, including flood fighting (real time), planning, and development.

Study on River Inventory and Monitoring Programme in Sarawak River

A memorandum of understanding (MoU) was signed in December 1st, 2008, between Sarawak River Board (SRB) and Usains Holding Sdn Bhd for Study on Inventory and Monitoring Programme. The study is a year long that focus on Sarawak River, amongst others to enhance the telemetry system, and it will cost Rm 300,000. According to Dr. Stephen Rundi Utom, the Chairman of SRB, budget for study is a federal finance from the Ministry of Natural Resources and Environment. It is expected that more finance will be available for other big rivers in Sarawak. Detailed information on the project components were elaborated by Dr. Lai Sai Hin from the River Engineering and Urban Drainage Research ( REDAC, one of research center from University Sains Malaysia) as follows: To monitor and give warning on river polluting activities, such as illegal dumping To create a river profile for navigational and sediment control, and connect it with a digital network at the SRB headquarters. To develop a network for a...

Water ResourcesDevelopment Studies in Sarawak

Inventory of water resources development studies in Sarawak: Miri-Bintulu Regional Planning Study (1977) Kuching Urban and Regional Master Plan Study (1974) Bintulu Regional Master Plan Study (1977) Prefeasibility Study for Limbang Valley River Basin (1979) Master Plan for Power System Development (1980) Feasibility Report – Samarahan River Basin Development (1981) National Water Resources Study (1982) Bakun Hydro-Electric Project – Feasibility Report (1983) Master Plan Study for Sewerage and Drainage System for Bintulu and its Environs (1984) Feasibility Study for the Master Plan for Rural Water Supply Coastal Region of Sarawak (1986) Plan Study for Coastal and Riverine Transport in Sarawak (1990) Sarawak Water Resources Study Projects (1995) Sebangan Bajong Agricultural Development Project, Preliminary Design Report Volume 1 – 5, Government of Malaysia (1995) Miri Town Drainage Master Plan Study, DID (1996) Feasibility Study for a Multi Purpose Dam on Sungai Sarawak K...

River Basins in Sarawak (Borneo)

Map of Sarawak River Basins Sarawak State is part of Borneo island and has been divided into 21 river basins, as follows: Kayan, 1,645 km2 Sg. Sarawak, 2,375 km2 Samarahan, 1,090 km2 Sadong, 3,550 km2 Lupar, 6,510 km2 Saribas, 2,200 km2 Krian, 1,500 km2 Lower and Upper Rajang, 47,880 km2 Oya, 2,195 km2 Mukah, 2,275 km2 Balingian, 2,510 km2 Tatau, 5,260 km2 Kemena, 6,100 km2 Similajau, 660 km2 Suai, 1,540 km2 Niah, 1,280 km2 Sibuti, 1,020 km2 Baram, 22,930 km2 Limbang, 3,950 km2 Trusan, 2,615 km2 Lawas, 1,050 km2. for more information please visit https://did.sarawak.gov.my/web/subpage/webpage_view/315